Design-to-Cost sounds methodical.

A framework. A discipline. A way to integrate cost considerations into product development from the beginning rather than discovering constraints too late.

Most organizations claim to practice it.

Very few actually do.

Not because they lack the tools or the methodology. Because Design-to-Cost requires someone to disappoint someone else before either party has invested enough to make the disappointment feel justified.

And most organizations—most leaders—would rather delay disappointment than distribute it early.

What Design-to-Cost Actually Demands

In theory, Design-to-Cost is straightforward:

Set a cost target. Design to meet it. Make trade-offs explicit. Align engineering, procurement, and finance from day one.

In practice, it requires something most people don’t name:

The willingness to say no before anyone has done enough work to prove you wrong.

Engineering wants a specification that solves the customer problem elegantly.

Procurement knows that specification will cost 40% more than the target allows.

Finance has committed the target to leadership three months ago.

Design-to-Cost means someone has to disappoint someone else now—not in six months when engineering has finished the design, procurement has exhausted supplier negotiations, and finance is explaining the variance.

The question isn’t whether to disappoint.

It’s who disappoints whom, and when.

The Pattern I Keep Seeing

I’ve worked on multi-million-dollar programs across industries.

Every one started with commitment to Design-to-Cost principles.

And in almost every case, here’s what actually happened:

Engineering proposed a specification. Procurement raised cost concerns. Engineering explained why the specification was necessary. Procurement said they’d “see what they could do.”

Translation: we’re not practicing Design-to-Cost.

We’re practicing Design-Then-Scramble-On-Cost.

The disappointment still happens. It just happens later, when it’s more expensive, more visible, and involves more people’s reputations.

Why?

Because telling engineering “this won’t work at this cost” in month two feels presumptuous.

Telling them the same thing in month eight feels like a necessary escalation backed by data.

Organizations prefer justified disappointment to early disappointment.

Even when early disappointment would save millions.

The Moment I Saw It Clearly

We were three months into supplier scouting for a critical component.

The specification had been locked. Engineering had done thorough work. The requirements made technical sense.

I sat in a meeting with engineering, cost engineering, and finance reviewing supplier quotes.

Every quote came in 35-45% above target.

Not because suppliers were inflating prices.

Because the specification required capabilities that cost money. Real money. More money than the target allowed.

Engineering’s response: “These quotes must be negotiable. Procurement needs to push harder.”

Finance’s response: “The target is fixed. Procurement needs to find cheaper suppliers.”

My response, the one I didn’t say out loud: “Everyone in this room knew this three months ago.”

We knew in month one that the specification and the cost target were incompatible.

But no one wanted to be the person who said it when it still felt like a solvable problem through harder work.

So we all worked harder. Produced more analysis. Ran more supplier negotiations. Demonstrated diligence.

And arrived at the same conclusion we could have reached in week two.

Except now we’d burned three months, reduced our timeline flexibility, and were having the conversation under pressure instead of with options.

What Design-to-Cost Actually Tests

Here’s the quiet truth:

Design-to-Cost isn’t a methodology problem.

It’s a courage problem.

It tests whether leaders are willing to force uncomfortable conversations before the organization has invested enough to make avoiding them feel reasonable.

It reveals who has the authority to disappoint whom.

Can procurement tell engineering “this specification is unaffordable” before engineering has completed the design work that would make that feedback feel late?

Can engineering tell marketing “customers want this feature but including it breaks the cost model” before marketing has built campaigns around it?

Can finance tell leadership “this cost target is impossible given the product requirements” before leadership has committed it to the board?

Most organizations discover the answer through expensive experience:

The people with the least authority disappoint the people with the most authority.

And they do it late, when options are limited and blame is easy to assign.

The Meeting No One Wants

Design-to-Cost requires a specific kind of meeting.

Early in the program. Before significant design work. Before procurement has negotiated with suppliers. Before finance has locked the model.

A meeting where everyone puts their constraints on the table:

Engineering: “Here’s what the product needs to do.”

Procurement: “Here’s what those capabilities will cost.”

Finance: “Here’s what we can afford.”

Leadership: “Here’s the trade-off we’re choosing.”

This meeting almost never happens.

Not because people don’t want to. Because having it requires admitting that the elegant solution and the affordable solution might not be the same solution.

And organizations spend remarkable energy pretending they might be, right up until the moment it becomes undeniable that they’re not.

The Real Cost

Here’s what I’ve learned over twenty years in procurement:

The cost of early disappointment is small.

You have time. You have options. You can adjust specifications, revisit requirements, challenge assumptions, explore alternatives.

The cost of late disappointment is enormous.

You have no time. Fewer options. Reputations attached to decisions. Stakeholders who’ve made commitments based on assumptions that are now proven wrong.

Design-to-Cost is the practice of choosing small disappointment over large disappointment.

And organizations that can’t do this aren’t lacking tools.

They’re lacking leaders willing to distribute disappointment when it’s still cheap to absorb.

What It Looks Like When It Works

I’ve seen Design-to-Cost work well exactly three times in my career.

Each time, it had the same characteristic:

Someone senior enough to override default organizational behavior insisted on the uncomfortable meeting early.

Not a gentle suggestion. Not a best practice recommendation.

An explicit decision: “We’re not moving forward until engineering, procurement, and finance agree on what’s actually possible at what cost.”

Engineering proposed specifications. Procurement provided real cost ranges based on current market capability—not aspirational negotiation targets. Finance stated actual constraints.

And then leadership made a choice.

Sometimes that choice was: adjust the cost target because the product requirements are non-negotiable.

Sometimes: simplify the specification because the cost target is fixed.

Sometimes: delay the program because we need both and can’t have both yet.

The choice mattered less than the timing.

Making it in month two with full information and options available is leadership.

Discovering it in month eight through escalating crises is just expensive learning.

The Question Most Leaders Don’t Ask

When Design-to-Cost fails, the post-mortem usually focuses on process:

  • “We need better cost estimation tools.”

  • “Engineering and procurement need to communicate earlier.”

  • “We need clearer governance on specification changes.”

These are symptoms, not causes.

The question no one asks: “Who was willing to disappoint whom, and when?”

Because that question reveals organizational power dynamics that process improvements can’t fix.

If procurement can’t tell engineering “this won’t work” in month two, better cost tools won’t help.

If engineering can’t tell marketing “customers won’t get this feature” before marketing has sold the vision, earlier communication won’t matter.

If finance can’t tell leadership “this target is impossible” before leadership has committed it externally, clearer governance is irrelevant.

Design-to-Cost works when the people with the uncomfortable information have permission to share it when sharing it would still be useful.

Most organizations grant that permission only after the information has become undeniable.

By which point it’s no longer useful—just expensive.

What This Means for Leadership

If you’re leading programs where Design-to-Cost matters, here’s the test:

Can your procurement team tell your engineering team “this specification is unaffordable” in the first design review?

Will they be heard, or will they be told to “find a way”?

If the answer is the latter, you’re not practicing Design-to-Cost.

You’re practicing Design-Then-Hope—and calling it something more sophisticated.

Real Design-to-Cost requires creating conditions where people can disappoint each other early, when disappointment is cheap.

That means:

  • Leaders who insist on the uncomfortable conversation in month two, not month eight.

  • Engineering that presents specifications with cost implications already visible.

  • Procurement that provides real market feedback, not optimistic assessments designed to avoid conflict.

  • Finance that states actual constraints, not aspirational targets.

And everyone accepting that the first pass won’t be the final answer.

Because if it is, someone wasn’t telling the truth about their constraints.

The Uncomfortable Realization

Here’s what makes this hard:

Early disappointment feels premature.

“We haven’t tried hard enough yet. Maybe there’s a solution we’re missing. Let’s do more analysis.”

This is organizational self-deception.

We frame delay as diligence. We call avoiding difficult conversations “keeping options open.” We mistake activity for problem-solving.

And we convince ourselves that the expensive crisis that arrives six months later was unavoidable—when the truth is we just delayed the conversation until it became a crisis.

Design-to-Cost isn’t about having better tools.

It’s about being willing to use the information you already have to make decisions people aren’t ready to make yet.

That’s not a methodology challenge.

That’s a leadership challenge.


The programs that work are the ones where someone senior enough says:

“We’re having the hard conversation now, while we still have options.”

The programs that struggle are the ones where everyone agrees to have the hard conversation later.

Later never comes at a convenient time.

It arrives as an escalation, a crisis, a variance that needs explaining.

Design-to-Cost is the practice of choosing inconvenient clarity over convenient ambiguity.

Most organizations say they want this.

Very few reward the people who actually practice it.

And that’s the real test.

Not whether you have the methodology.

Whether you have the leaders willing to disappoint the right people at the right time.

Before it becomes too expensive to matter.